Email
Find a Representative
(603) 644-2500
🇺🇸 USA
🇬🇧 UK
🇩🇪 Germany
×
HOME
PRODUCTS
View All Products
Conveyor Belts
Conveyors
Drive Components
Accessories
HELP CENTER
ABOUT US
Overview
News & Events
Our History
Our Culture and People
Certifications, Policies & Awards
Our Commitment To Sustainable Energy
Careers
Internship Programs
CONTACT US
Overview
Contact Support
Request A Quote
Inspection And Installation Check List
Home
Help Center
Inspection And Installation Check List
Download PDF
Yes
No
Before you begin joining make sure:
1. The power to conveyor is disconnected
2. Wear safety glasses
3. Correct replacement belt is selected
4. Correct tools are on hand
5. All tensioning mechanisms are released
6. Belt is threaded onto conveyor right (smooth) side up
7. Loop edges curve back away from direction of belt travel
8. Belt edges are tied together with wire, twine, or a plastic wire tie
Yes
No
After joining/installation is completed:
9. Check drive sprocket alignment for 3 to 5mm clearance with Z-bends (belt joints)
10. Check sprocket teeth alignment (Not needed if shaft is “keyed”)
11. Check position of wear strips and adjust if making contact with Z-bends (belt joints)
12. Check belt tracking in grooved end rolls and transfer rollers
13. Re-tighten/adjust tension
14. Test tracking by running belt without product; adjust belt
15. Check for proper disposal of old wire and all wire pieces
16. Return tools to proper storage location
Yes
No
Conveyor safety check:
17. Are the operating instructions clearly listed and posted?
18. Are they safety guards adequate to prevent accident and injury?
19. Are the limit switches and alarms working?
20. Do the personnel know the location of the emergency stop/control switches?
Yes
No
Routine maintenance inspection and evaluation:
21. Check belt surface for bent or broken wire strands; straighten or repair immediately
22. Check joining clips (if used) for wear/damage
23. Check all conveyor components for excessive wear (drive sprockets, blanks, wear strips, etc.) and replace if needed
24. Check sprocket alignment for 3 to 5mm clearance
25. Check sprocket teeth alignment (Not needed if shaft is “keyed”)
26. Check position of wear strips and adjust if making contact with Z-bends (belt joints)
27. Check belt tracking in grooved end rolls and transfer rollers
28. Check tension; adjust tension mechanisms as necessary
29. Check levelness of conveyor frame
30. Test tracking by running belt slowly without product